When Telangana was formed in 2014, its total power capacity was 7,778 megawatts and its farmers received erratic supply. By 2023, total capacity had more than doubled to 19,475 MW and 27.49 lakh farm connections received 24 hours of free electricity, every single day. Solar capacity grew from 74 MW to 5,865 MW. Transmission losses at 2.47 percent were among the lowest in the country. Hyderabad became the most preferred IT destination in the world and a metro city moving at the pace of its own ambition.
Chapter VIIIThe New TelanganaRecord TL·VIII·01
The leaders of united Andhra Pradesh had told the people of Telangana that the region would go dark if the state was divided. They said the power plants were in coastal Andhra and Rayalaseema and that Telangana had nothing. Within nine years, Telangana had built one of the most robust power grids in India, with a per capita consumption of 2,126 units per year, 69.4 percent higher than the national average of 1,255 units. Transmission losses of 2.47 percent, among the lowest in the country, showed not just that the grid was large but that it worked efficiently. And the decision to provide free 24-hour power to all agricultural consumers, while every other state was metering and charging farmers, was a statement about what kind of government Telangana had chosen to be.
7,778 → 19,475 MW
Total Power Capacity, 2 June 2014 to 2023
More than doubled in nine years. Solar capacity alone grew from 74 MW to 5,865 MW, an 80-fold increase. 27.49 lakh agricultural connections receive 24 hours of free electricity, every day of the year. Transmission losses at 2.47% are among the lowest in the country. Rs.39,321 crore invested in strengthening the transmission and distribution network.
Ramagundam: thermal power raised on Singareni coal. The united state said Telangana would go dark alone; by 2023 its grid had doubled to 19,475 MW with the lowest transmission losses in India.
Photo: Getsuhas08 · CC BY-SA 3.0 · Wikimedia Commons
Power Sector: Complete Statistics
Parameter
02 June 2014
01 May 2023
Addition
Total Contracted Capacity (MW)
7,778
19,475
11,697
Solar Capacity (MW)
74
5,865
5,791
Peak Demand (MW)
5,661 (06.06.2014)
15,497 (30.03.2023)
9,836
Max grid consumption (Million Units)
128 (06.06.2014)
297.89 (14.03.2023)
169
400 KV Substations
6
25
19
220 KV Substations
51
103
52
132 KV Substations
176
250
74
Total EHT Substations
233
378
145
Total EHT Line Length (CKM)
16,379
27,986
11,607
33 KV Substations
2,138
3,200
1,062
Distribution Line Length (Lakh KM)
4.89
6.72
1.83
Power Transformers
3,272
5,672
2,400
Distribution Transformers (Lakhs)
4.67
8.56
3.89
Agricultural Connections (Lakhs)
19.03
27.49
8.46
Total Consumers (Crores)
1.11
1.78
0.67
Key Achievement
Details
24-hour free power to farmers
27.49 lakh agricultural connections receive uninterrupted free power, every day. Gujarat charges 0.60 paisa and supplies only 8 hours. Telangana supplies 24 hours free.
Transmission losses
2.47%, one of the lowest in the country
Per capita consumption
2,126 units in 2021-22, against the national average of 1,255 units, 69.4% higher than India's average
Investment in T&D network
Rs.39,321 crore spent after state formation in strengthening transmission and distribution
Annual subsidy to DISCOMs, 2023-24
Rs.11,500 crore for free agricultural power and subsidised domestic supply
Additional subsidy, 2016-17 to 2021-22
Rs.9,161 crore over five years in additional support to distribution companies
Regularisation of outsourced workers
22,722 outsourced persons regularised, the only state in India to do this
TSGENCO installed capacity
Thermal 4,042.50 MW, Hydel 2,441.76 MW, Solar 1 MW. Total TSGENCO 6,485.26 MW. Singareni Thermal additional 1,200 MW.
Yadadri Thermal Power Station 4,000 MW (5x800 MW) at Damarcherla, Nalgonda
Roads and Infrastructure
The KCR government treated road construction not as a departmental function but as a state priority. As Municipal Administration and Urban Development Minister, KTR drove Hyderabad's infrastructure transformation with the same energy he brought to the IT sector. The Strategic Road Development Programme, the Metro Rail expansion, the GHMC's Rs.67,000 crore infrastructure spend, and the modernisation of Hyderabad's roads, drains and public spaces were all executed under his direct oversight. Field level roads received attention that had never been given before. In Naxal-affected areas alone, 426 km of roads and 22 bridges were constructed at a cost of Rs.633.33 crore, opening regions that had been isolated for decades. Across the state, 8,218 km of two-lane roads were laid, 321 km of four-lane roads constructed and 382 bridges built in a single nine-year period.
8,218 km
Two-lane roads laid from 2014 to 2022, plus 321 km of four-lane and 39 km of six-lane roads
33
SRDP works completed in Hyderabad including 17 flyovers, 5 underpasses, 7 ROBs/RUBs, cable-stayed bridge and steel bridges
Rs.67,000 Cr
Infrastructure expenditure in Greater Hyderabad in seven years, transforming the city's roads, drainage, water supply and public spaces
Roads and Buildings Achievement
Details
Two-lane roads laid, 2014 to 2022
8,218 km
Four-lane roads constructed
321 km
Six-lane roads constructed
39 km
Bridges constructed
382
Road repairs undertaken
8,064 km
State highways maintained
27,734 km total including 4,983 km national highways
ROBs/RUBs constructed
23, at a cost of Rs.438.40 crore
Roads in Naxal-affected areas
426 km roads and 22 bridges at Rs.633.33 crore
Integrated District Office Complexes
Sanctioned in 30 districts at Rs.1,649.62 crore. Completed in 20 districts.
New Secretariat
Dr. BR Ambedkar Telangana State Secretariat constructed at Rs.617 crore. Inaugurated 30 April 2023. Gold rated by IGBC.
Police Command and Control Centre
State-of-the-art building in Banjara Hills at Rs.585 crore. Can monitor footage of one lakh cameras within a minute.
Martyrs Memorial
Constructed at Lumbini Park, Hussain Sagar at Rs.177.50 crore. 27-metre stainless steel stupa.
Ambedkar statue
125-foot bronze statue, tallest in India, at Rs.146.50 crore. Unveiled 14 April 2023.
Strategic Road Development Programme (SRDP), Hyderabad
SRDP Component
Sanctioned
Completed
Flyovers
46
17
Vehicle Underpasses
7
5
Road Over Bridges/Road Under Bridges
7
7
Junction improvements
46
Multiple
Cable-stayed and steel bridges (incl. Durgam Cheruvu)
2
2
Total project cost
Rs.5,937 crore
Total works
47
33 completed
Metro Rail: The World's Largest PPP Metro
69 km
Hyderabad Metro Rail, Phase I, Three Corridors
The largest Public Private Partnership metro rail project in the country. 4.5 lakh passengers travel daily. 30 crore total passengers by December 2022. 50 prestigious awards received. Phase II: 31 km Airport Metro from Raidurg to Shamshabad, Rs.6,250 crore, foundation stone laid by CM KCR on 9 December 2022.
Metro Rail Parameter
Details
Phase I total length
69 km across three corridors
Corridor 1: Miyapur to LB Nagar
29 km. Inaugurated 28 November 2017 by Prime Minister Modi and CM KCR.
Corridor 2: Nagole to Ameerpet
20 km. Extended to Hi-Tech City 10 km, inaugurated 20 March 2019.
Corridor 3: JBS to Falaknuma
10 km. Inaugurated 7 December 2020 by CM KCR.
Daily passengers
4.5 lakh, back to pre-COVID levels
Total passengers since inception
30 crore by December 2022
Awards received
50 prestigious national and international awards
Signalling system
First metro in India with Communication Based Train Control technology
Employment generated
Over 50,000 jobs through related industries
Phase II: Airport Metro
31 km from Raidurg Mind Space Junction to Shamshabad Airport. Rs.6,250 crore. Foundation stone laid 9 December 2022. 100% state-funded project.
Harithaharam: Greening Telangana
273.33 Crore
Saplings planted under Harithaharam, 2015 to 2023
Launched by CM KCR on 3 July 2015. Target was 230 crore saplings. Telangana exceeded its own target by 43 crore. Green cover in the state increased by 7.7% per the Forest Survey of India 2021 report. Rs.10,822 crore spent. Harithaharam has been described as the third largest human effort to increase the greenness of the earth after China and Brazil.
Harithaharam Achievement
Details
Total saplings planted, 2015 to May 2023
273.33 crore
Target set
230 crore, exceeded by 43.33 crore
Total expenditure
Rs.10,822.46 crore
Increase in green cover
7.7% increase per Forest Survey of India 2021
Programme launched
3 July 2015 by CM KCR
Green Budget, Haritanidhi
Telangana is the first state in the country to set up a dedicated Green Budget with participation of all sections of society
Phase IX target
19.29 crore saplings. 30.29 crore plants available in 14,864 nurseries.
Palle Pragathi rural greening
Nurseries in 12,756 Gram Panchayats. Rural nature forests in 19,472 areas. 3,324 km multilayer avenue plantation.
From leaders of erstwhile Andhra saying "Telangana will go dark if bifurcated" to the state that provides 24 hours of continuous free electricity. The total capacity of power increased from 7,778 MW in 2014 to 19,475 MW in 2023. Telangana proved every prediction wrong.
Highlights of BRS Government, Nine Years, Power Sector
Power, Roads and the City, Key Achievements
Total power capacity more than doubled from 7,778 MW to 19,475 MW. Solar capacity grew from 74 MW to 5,865 MW, an 80-fold increase in nine years.
27.49 lakh farm connections receive 24 hours of free electricity daily. Transmission losses of 2.47% are among the lowest in India. Per capita consumption of 2,126 units is 69.4% above the national average.
Rs.39,321 crore invested in the transmission and distribution network. 22,722 outsourced power workers regularised, the only state in India to do this.
8,218 km of two-lane roads laid. 321 km of four-lane roads. 382 bridges built. 47 SRDP projects in Hyderabad including 17 flyovers. Rs.67,000 crore spent on Hyderabad infrastructure in seven years.
Hyderabad Metro Rail Phase I: 69 km, world's largest PPP metro project, 4.5 lakh daily passengers, 50 awards. Phase II: 31 km Airport Metro at Rs.6,250 crore under construction.
Harithaharam planted 273.33 crore saplings, exceeding the target of 230 crore. Green cover increased by 7.7%. Rs.10,822 crore spent. First state to create a dedicated Green Budget.
New Secretariat named after Dr. BR Ambedkar, Gold rated by IGBC. 125-foot Ambedkar statue, tallest in India. Martyrs Memorial on the shores of Hussain Sagar. Police Command and Control Centre monitoring one lakh CCTV cameras.